April 2019 | Construction sites
Construction site – Grand Hotel Rhodania
Construction works for the 5-star Grand Hotel Rhodania in Crans Montana have begun. Like a fascinating, gaping chasm, the excavation pit descends three storeys into the ground between the two adjoining buildings. The base slab for one section of the underground garage has already been concreted. It is hard to believe that, come summer 2020, six storeys and a roof parapet will have risen up. Completion of the new dream hotel with luxury spa has been planned for the end of 2021.