![](https://www.monoplan.com/wp-content/uploads/2019/11/iht_7.ogbaustelle__headers_1200w_610h.jpg)
April 2019 | Construction sites
Construction site – Interalpen-Hotel Tyrol
In just a few weeks’ time, the Interalpen-Hotel Tyrol will have seven new panorama suites. The building works are in full swing. Piece by piece, like slices of a pie, the hexagonal-shaped top floor is being deconstructed, and, using a wood construction combined with steel beams, being completely rebuilt.
The hotel’s BLOG site also reports on the conversion, and there is even a drone flight video.
And this is what it will look like after the conversion works have finished: IHT 7. OG